If you have any inquiries regarding suspended scaffold installation and removal, please don’t hesitate to contact us at 21 or comment below. P.Wolfe Consultants is your premier permit expediter in New York, we will get you to the end on time and on budget. The previous 60-day re-notification for all adjustable suspended scaffolds, regardless of the time they were installed is no longer required. When the scaffold is again ready to be installed or removed, then the licensed professional need to notify the department within the parameters set for new notification.Ī separate notification is necessary for each type of adjustable suspended scaffold to be used while a separate notification is not required for each individual scaffold. If the scaffold is not installed or removed during the specified 24-48 hr window, a re-notification is required, the architect or PE should call the department to cancel the notification. A representative from the department will give an individual confirmation number and this confirmation number will be valid until the removal of the scaffold from the jobsite. ![]() As of February 20, 2020, the new Façade Rule has been in effect. See NYC Construction Codes §28-302.1 and RCNY §103-04.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |